Project Plan

2015

  • McKinley Highway Reconstruction at Ash Road Intersection Improvement – widening for turn lanes and upgrade traffic signal (2016 Construction), cooperative project with Elkhart County & Elkhart County Redevelopment Commission
  • Olive Street/Sample Street Intersection Improvement and Overpass Reconstruction – roundabout construction, bridge deck replacement, and sidewalk and lighting replacement (2016 Construction), cooperative project with the City of South Bend
  • Complete Gumwood Road Corridor Reconstruction from Mishawaka City Limits to State Line – includes multi-use path construction, sidewalk installation, and added travel lanes
  • Union Road over a Branch of Robbins Ditch Bridge Replacement
  • Proposed Paving and Perservative Maintenance Program

2016

  • Cleveland Road Reconstruction from Riverside Drive to SR 933 and Bridge Rehabilitation over the St. Joseph River – includes road reconstruction, multi-use path and bridge deck replacement
  • LaSalle Trail Extension from Cleveland Road to Darden Road – cooperative project with County Parks
  • Adams Trail Extension from west of Fir Road to Elm Road – cooperative project with The Friends of Granger Paths
  • Riley Road over Gross Ditch Bridge Replacement
  • 20-30 miles local road paving

2017

  • Edison Road at Ash Road Intersection Improvement – roundabout
  • Fir Road at Brick Road Intersection Improvement – roundabout
  • Walnut Road over Yellow Bank Creek Bridge Replacement
  • LaSalle Trail Extension from Darden Road to Auten Road – cooperative project with County Parks
  • Portage Road over Conrail Rail Road Bridge Replacement
  • 20-30 miles local road paving

2018

  • LaSalle Trail Extension from Auten Road to State Line – cooperative project with County Parks
  • Underwood Road over Pine Creek Bridge Replacement
  • 20-30 miles local road paving

2019

  • Auten Trail from Laurel Road to SR 933 – paved shoulder widening and lighting improvements
  • Bendix Road over Toll Road Bridge Rehabilitation
  • Redwood Road over Potato Creek Bridge Replacement
  • 20-30 miles local road paving

2020

  • Ironwood Road at Douglas Road Intersection Improvement – widening for turn lanes and upgrade traffic signal (possible corridor reconstruction/added travel lanes from Ivy Road to SR 23)
  • McKinley Highway Reconstruction from Birch Road to Ash Road – widening for added travel lanes and sidewalks
  • Crumstown Trail over Laskowski Ditch Bridge Replacement
  • 20-30 miles local road paving
 